Ricken Tunnel

This 8603-metre railway tunnel runs beneath the Ricken Pass, which links the Linth Plateau with the Toggenburg region. It forms a section of the line between Uznach and Wattwil. Construction on the tunnel started in 1904 and lasted six years. Its perfect straightness and consistent 15% gradient are a special feature of this structure.